DRESSER KELLOGG - RO1 PROCESS MODULE
Client:DRESSER KELLOGG SOUTH AFRICA
Date:December 1998 - October 1999
Facility:"A" Berth & Blackheath
Location:Cape Town, South Africa
Project Scope
Procurement, fabrication, testing and pre-commissioning of RO1 Process Module (slug catcher, hydrocylones, filters, pumps).

Graphic
Graphic
Prefabrication at Blackheath workshop of upper box (35 tons), transportation to A Berth using special wide load truck, where main structure was being fabricated (100 tons).

Assembly using the harbour floating crane, painting, testing and pre-commissioning before load out on board installation vessel.

Total weight: 360 tons including:
  • Structual steel = 138 tons
  • Piping = 90 tons (30 tons duplex)
  • Mechanical = 120 tons
  • Electrical and Instrumentation = 12 tons

Graphic
Lower Box ex Blackheath