Project Scope
Procurement, prefabrication, erection of large bore process piping.
Installation and alignment of major equipments: crystallisers, fluid bed, pre-heater, vibrating screens. |
Fabrication of large bore stainless steel process piping, (from BUHLER Drawings process designers) in Blackheath Workshop, transport to site for erection. Testing was a service test by systems through major equipment.
All major equipments were installed, levelled, secured and aligned.
Service piping (compressed air, instrument air, nitrogen, and potable water) all materials were processed and site run on the contract from P & ID Drawings. |  |
The Pet-2 Tower: 43m high and consisted of 5 levels, majority of the major equipments and large bore process piping was above the 15m level.
Procurement of 170m stainless steel Sch. 10 piping for chip transfer lines.Process piping = 450m +- 4 mm wall thickness, size range from 1000 mm to 150 mm average size 800 mm all stainless steel.
Service piping consisted of 1236 m Carbon Steel Sch. 40 piping size range from 100 to 15 mm. |
|