| Client: | ISCOR | | Date: | January 2002 – June 2002 | | Location: | Saldanha Steel - South Africa |
|  |
Project Scope:
- Design and Fabrication of Platform for replacement of refractory.
- The preparation of the Melter Gasifier shell and the installation of 64 copper staves and one cast iron stave.
- The cutting out and re-welding of the tap nozzles.
- The installation of the main tap runners and the level detectors.
- The modification of the DRI feeder steelwork and installation of new system.
- Manufacture and installation of heat-up piping
|  |
Other projects that ran concurrent to this was the Laminar Cooling Piping.
Weight of Platforms
|
Column | 6.4 dwt | |
Dome (Top) Platform | 6.1 dwt | |
Working Platform | 4.3 dwt |
| Safety Platform | 3.0 dwt. |
Drilling of Staves
Hole tolerance allowable = - 0 + 3mm |  |
|