MITTALL STEEL - COREX MINI RELINE
Client:ISCOR
Date:January 2002 – June 2002
Location:Saldanha Steel - South Africa
Project Scope:
  • Design and Fabrication of Platform for replacement of refractory.
  • The preparation of the Melter Gasifier shell and the installation of 64 copper staves and one cast iron stave.
  • The cutting out and re-welding of the tap nozzles.
  • The installation of the main tap runners and the level detectors.
  • The modification of the DRI feeder steelwork and installation of new system.
  • Manufacture and installation of heat-up piping

Graphic
Other projects that ran concurrent to this was the Laminar Cooling Piping.
Weight of Platforms
Column 6.4 dwt
Dome (Top) Platform 6.1 dwt
Working Platform 4.3 dwt
Safety Platform 3.0 dwt.

Drilling of Staves
Hole tolerance allowable = - 0 + 3mm