Client:

DRESSER KELLOGG SOUTH AFRICA

Location:

Cape Town, South Africa

Project Scope:

Procurement, fabrication, testing and pre-commissioning of RO1 Process Module (slug catcher, hydrocylones, filters, pumps).

Prefabrication at Blackheath workshop of upper box (35 tons), transportation to A Berth using special wide load truck, where main structure was being fabricated (100 tons).

Assembly using the harbour floating crane, painting, testing and pre-commissioning before load out on board installation vessel.

Total weight: 360 tons including:

  • Structural steel = 138 tons
  • Piping = 90 tons (30 tons duplex)
  • Mechanical = 120 tons
  • Electrical and Instrumentation = 12 tons