FPSO “GLAS DOWR” – Piping, Elec and Instrument

Client: Bluewater Energy Services BV Location: PetroSA “Sable” Field, South Africa Project Scope: Based upon Bluewater’s Project Engineering and issued Isometrics (845) SA Five were contracted to provide fabrication engineering, draughting, procurement, fabrication, erection, full painting system including insulation, bolt tensioning, chemical cleaning, pre-commissioning of pipework, including nitrogen-helium leak testing and hydro testing. Pipework ranging…

DRI Bin Repair (IMAGES NEEDED)

Client: ARCELORMITTAL SA Contract Type: Reimbursable (Rates) Facilities: ArcelorMittal Saldanha Works / SA Five Workshop at Blackheath & Site Scope of Work: SA Five Engineering completed this project on behalf of ArcelorMittal, Saldanha. The project included the re-design, manufacture and installation of more than 200 tons of structural steelwork, the installation of repaired and new…

UWG – Five Slot Template

Client: UWG (BRISTOL) UK Location: Morsa West Area, Angola Project Scope: To supply and fabricate the Five Slot Template complete with centralisers and 500mm diameter Clamps including Balancing and weighting the template, load testing and balancing the running tool. Project Description: The project is for the Morsa West Area – Block 2 – Angola. An…

TMAC – Table Mountain Cableway

Client: T.M.A.C Location: Table Mountain Cableway Project Scope Procurement, fabrication and erection on site of architectural steelwork, main structural support structure, viewing platforms, upper and lower cable station. Pre-fabrication at Blackheath Workshop of all structural steelwork, transportation to site and erection on Table Mountain of 3 viewing platforms & 2 bridges. Total Structural Weight 360…

Schlumberger – Orca Drilling Rig Conversion

Client: SCHLUMBERGER Location: Simonstown Harbour, South Africa Project Scope Fabrication, erection of piping. Pre-fabrication at Blackheath Workshop, transportation to Simonstown Naval dockyard and erection on the Orca rig of pipework ranged from Schedule 40 strong, 4″ to 16″ diameter. Installation of Mechanical items on riser platforms: hose reels, pumps, umbilicals. Testing & pre-commissioning. Tonnage Analysis…